Base scope
CCTV and recording, secure network, ISCR monitoring, standard QR/badge access, and priority AI safety workflows.
STERLITE ELECTRIC LIMITED / PCB VADODARA
Executive approval brief and technical design basis for plant-wide camera coverage, access scanning and safety analytics.
EXECUTIVE DECISION
Authorize detailed engineering and a representative pilot to verify coverage, gate throughput, alert quality and 30-day storage sizing. The priced BOQ and pilot results support the subsequent plant-wide procurement decision.
CCTV and recording, secure network, ISCR monitoring, standard QR/badge access, and priority AI safety workflows.
One supervised lane for credential-linked, one-to-one face verification. Enable only after SEL’s HR, Legal/Privacy, Security and IT/OT sign-off. QR/badge remains available.
Approve the final camera schedule, capacity, network routing, priced scope and acceptance criteria before placing the rollout order.
To close before procurement. Reconcile the extra Gate 1 bullet (131 RFQ vs 132 scheduled), the 28 VCV allocation points and overlap, the 6-panel RFQ vs 2 × 2 video wall description, the RAOC stream count and the separate AMC start date.
END-TO-END DESIGN
Domes, bullets, fisheye, PTZ, dedicated ANPR and task cameras. Separate QR/badge and optional face terminals.
Video · access · equipment eventsCertified Cat 6 copper to the nearest cabinet. Size PoE by maximum camera draw, including IR and PTZ operation.
Camera VLAN · Access VLANSingle-mode fiber and matched SFPs to the security core. Validate uplinks, route diversity and surviving-path load.
Managed uplinks · firewall / ACLsVMS/NVR and storage, edge AI/GPU, event broker, access integration and restricted identity services.
Time sync · monitoring · backupsOperator consoles, video wall, evidence playback, incident queue and approved horn or stack-light notifications.
Security · EHS · plant operations| Data path | Integration and network boundary | Behaviour and acceptance |
|---|---|---|
| Camera → VMS and AI | Record selected main streams to the allocated NVR/VMS. Send dedicated analysis streams only where rules need them. Validate ONVIF Profile T for video and Profile M or OEM APIs for supported metadata. | Prove discovery, live view, time sync, playback, PTZ, event delivery and recorder or analytics outage behaviour on exact firmware. |
| Scanner → access controller | Separate access network. Credential service validates badge/QR and permitted zone. Optional face service returns a bounded verification outcome. Entry controller checks egress and gate safety inputs separately. | Verify approved and expired credentials, mismatch, reader outage, supervised fallback and emergency egress. |
| Plant equipment → incident service | Approved read-only gateway for guard, crane, PLC and fire-panel status. Sensor signals can drive evidence capture and approved local alerts. | Validate timestamps and failover. Protective functions and emergency signaling stay in the independent equipment and life-safety systems. |
| RAOC → common operator view | Use an approved VMS federation or gateway. Check stream inventory, licenses, connectivity, playback access and time sync. | Agree viewing from existing recorders or additional local recording. Size network and disks for the chosen policy. |
| Management and support | Isolate CCTV, access, recording, operator, management and OT traffic by role and route. Use named accounts, MFA for administration, approved remote support, restricted firewall rules and logged configuration changes. | Confirm least-privilege access, service credentials, outage alarms and audit records. Test configuration backup and restoration. |
BOQ basis includes 21 × 8-port and 2 × 24-port access switches, 50 × 1G SFPs, fiber and copper. Confirm actual switch PoE capabilities and power budget, cabinet layout, fiber routes and spare cores, UPS capacity, and core/uplink redundancy during survey.
ON-PREMISES INFRASTRUCTURE
Fiber LIU and copper panels, labeled links, security firewall and managed core. Confirm independent uplink routes and spare ports.
128- and 32-channel NVRs in the RFQ, VMS and AI compute, evidence storage, monitoring and configuration backup. Verify camera channels and throughput per recorder.
RFQ includes one 32U rack and one UPS up to 10 kVA. Confirm rack space, heat load, runtime, environmental monitoring, earthing, surge protection, controlled access and shutdown recovery.
Monitor link loss, camera health, storage fill and recording gaps. Define critical-channel buffering, spare stock, failover, backup restoration and the oldest-playable-record audit.
Recorder decision. The primary NVR lists 512 Mb/s recording bandwidth. Its 8 × 16 TB provides 128 TB raw and about 96 TB with RAID 6 before formatting and reserve. Validate the secondary recorder’s disk and throughput capability and allocate or expand storage to meet the tested workload.
OPTIONAL SCANNER UPGRADE
Scope facial recognition to 1:1 verification at the kiosk. Keep biometric templates separate from VMS/incident evidence. Use controlled enrolment, restricted access, encryption, retention/deletion and audit. Review the applicable Indian privacy obligations, commencement dates and worker notice with SEL before collecting biometric data.
CONTROL ROOM AND GOVERNANCE
Capture event → show camera, location and clip → acknowledge → route to the responsible team → verify action and close the case. Review alert quality, recurrence and open actions on the plant dashboard.
| Owner | Operational responsibility | Management evidence |
|---|---|---|
| Security / ISCR | Own 24-hour gate and perimeter monitoring, triage, guard fallback, authorised playback and exports. | Incident timeline, acknowledgment/closure, dispatch and override audit. |
| Production / EHS | Define and verify site rules for forklifts, lifts, PPE, pedestrian routes, guards and handling. Confirm incidents before corrective action. | Verified alerts, repeat zones, open corrective actions, nuisance events and missed detections from test reviews. |
| IT/OT and Maintenance | Own service health, secure remote access, patches, backups, device integrity and read-only OEM integrations. | Camera availability, recording gaps, storage headroom, capacity alarms and restore results. |
| HR / Legal / Occupational Health | Approve purpose, access and data lifecycle. Restrict optional biometric administration and health referrals to authorised staff. | Enrollment and deletion audit if enabled, access review and exception handling. Screening details stay in the Occupational Health workflow. |
Continuous video follows the SLA retention design. Agree retention separately for event clips, plate logs, access records and any biometric templates. Use restricted exports with audit, approved privacy masking, and disabled unused audio. Align service desk and escalation with the draft SLA’s severity 1–4 resolution schedule of 4 / 12 / 24 / 96 hours. Confirm service-credit triggers, weekly reports and quarterly maintenance.
DELIVERY AND ACCEPTANCE
| Indicative timing | Release evidence | Approval owners |
|---|---|---|
| Weeks 1–2 · Survey | Confirmed gate lanes, camera count, floor positions, RAOC inventory, civil/fiber route and machine asset list. | Security, EHS, Engineering and IT/OT |
| Weeks 3–4 · Design / FAT | Signed camera view plan and I/O list, exact firmware interoperability, network/storage/UPS budgets and priced scope. | Plant Engineering, IT/OT and Procurement |
| Weeks 5–7 · Pilot | Day/night gate and perimeter checks, representative AI rules, operator drill, outage recovery and optional scanner evaluation using approved pilot data if separately authorised. Agree measured throughput, false matches/non-matches, presentation-attack checks and manual fallback. | Security, EHS, IT/OT and HR/Legal for optional face verification |
| Weeks 8–12 · Rollout / SAT | Zone sign-off, clip/alert evidence, restoration tests, operator training and signed handover. Audit 30-day playback after the archive accrues. | Plant Head and workstream owners |
Pilot scorecard. Record alert recall by rule and shift, false alerts per camera-hour, 95th-percentile time to alert, throughput at peak shift change, camera uptime and recovery after link or recorder loss. Agree thresholds and sample sizes with the owners before testing.