MachineKonnectJantek Projects & Consultancy

STERLITE ELECTRIC LIMITED / PCB VADODARA

Plant security architecture

Executive approval brief and technical design basis for plant-wide camera coverage, access scanning and safety analytics.

131 / 132RFQ / scheduled cameras
30 daysminimum SLA playback
12 weeksindicative rollout from kickoff

EXECUTIVE DECISION

Approve the survey, design and pilot

For management approval

Authorize detailed engineering and a representative pilot to verify coverage, gate throughput, alert quality and 30-day storage sizing. The priced BOQ and pilot results support the subsequent plant-wide procurement decision.

Base scope

CCTV and recording, secure network, ISCR monitoring, standard QR/badge access, and priority AI safety workflows.

Optional scanner pilot

One supervised lane for credential-linked, one-to-one face verification. Enable only after SEL’s HR, Legal/Privacy, Security and IT/OT sign-off. QR/badge remains available.

Commercial release

Approve the final camera schedule, capacity, network routing, priced scope and acceptance criteria before placing the rollout order.

Plant Head / CEO decisionApprove pilot · Approve with conditions · Return for revision
Approved by and date

To close before procurement. Reconcile the extra Gate 1 bullet (131 RFQ vs 132 scheduled), the 28 VCV allocation points and overlap, the 6-panel RFQ vs 2 × 2 video wall description, the RAOC stream count and the separate AMC start date.

END-TO-END DESIGN

Camera, scanner and control-room connectivity

Open camera coverage ↗
01 · FIELD

Cameras and scanners

Domes, bullets, fisheye, PTZ, dedicated ANPR and task cameras. Separate QR/badge and optional face terminals.

Video · access · equipment events
02 · FIELD CABINETS

Managed PoE access

Certified Cat 6 copper to the nearest cabinet. Size PoE by maximum camera draw, including IR and PTZ operation.

Camera VLAN · Access VLAN
03 · BACKBONE

Fiber and core

Single-mode fiber and matched SFPs to the security core. Validate uplinks, route diversity and surviving-path load.

Managed uplinks · firewall / ACLs
04 · DATA ROOM

Recording and analytics

VMS/NVR and storage, edge AI/GPU, event broker, access integration and restricted identity services.

Time sync · monitoring · backups
05 · OPERATIONS

ISCR and local response

Operator consoles, video wall, evidence playback, incident queue and approved horn or stack-light notifications.

Security · EHS · plant operations
Data pathIntegration and network boundaryBehaviour and acceptance
Camera → VMS and AIRecord selected main streams to the allocated NVR/VMS. Send dedicated analysis streams only where rules need them. Validate ONVIF Profile T for video and Profile M or OEM APIs for supported metadata.Prove discovery, live view, time sync, playback, PTZ, event delivery and recorder or analytics outage behaviour on exact firmware.
Scanner → access controllerSeparate access network. Credential service validates badge/QR and permitted zone. Optional face service returns a bounded verification outcome. Entry controller checks egress and gate safety inputs separately.Verify approved and expired credentials, mismatch, reader outage, supervised fallback and emergency egress.
Plant equipment → incident serviceApproved read-only gateway for guard, crane, PLC and fire-panel status. Sensor signals can drive evidence capture and approved local alerts.Validate timestamps and failover. Protective functions and emergency signaling stay in the independent equipment and life-safety systems.
RAOC → common operator viewUse an approved VMS federation or gateway. Check stream inventory, licenses, connectivity, playback access and time sync.Agree viewing from existing recorders or additional local recording. Size network and disks for the chosen policy.
Management and supportIsolate CCTV, access, recording, operator, management and OT traffic by role and route. Use named accounts, MFA for administration, approved remote support, restricted firewall rules and logged configuration changes.Confirm least-privilege access, service credentials, outage alarms and audit records. Test configuration backup and restoration.

BOQ basis includes 21 × 8-port and 2 × 24-port access switches, 50 × 1G SFPs, fiber and copper. Confirm actual switch PoE capabilities and power budget, cabinet layout, fiber routes and spare cores, UPS capacity, and core/uplink redundancy during survey.

ON-PREMISES INFRASTRUCTURE

Data room and recording capacity

30-day SLA basis

Security core and patching

Fiber LIU and copper panels, labeled links, security firewall and managed core. Confirm independent uplink routes and spare ports.

Compute and storage

128- and 32-channel NVRs in the RFQ, VMS and AI compute, evidence storage, monitoring and configuration backup. Verify camera channels and throughput per recorder.

Rack and services

RFQ includes one 32U rack and one UPS up to 10 kVA. Confirm rack space, heat load, runtime, environmental monitoring, earthing, surge protection, controlled access and shutdown recovery.

Continuity and retention

Monitor link loss, camera health, storage fill and recording gaps. Define critical-channel buffering, spare stock, failover, backup restoration and the oldest-playable-record audit.

Recording capacity estimator

Continuous recording · decimal TB · editable planning assumptions

Video ingress
Recorded video
Usable capacity incl. reserve

Capacity excludes parity, filesystem and duplicate clips. Count RAOC and specialist feeds here only if recorded locally. Add playback, analytics traffic, failover and network overhead to separate sizing checks.

Recorder decision. The primary NVR lists 512 Mb/s recording bandwidth. Its 8 × 16 TB provides 128 TB raw and about 96 TB with RAID 6 before formatting and reserve. Validate the secondary recorder’s disk and throughput capability and allocate or expand storage to meet the tested workload.

OPTIONAL SCANNER UPGRADE

QR or badge with optional face verification

Optional · disabled by default
  1. Present credential. Read QR or badge and resolve one claimed record. Check validity, induction, role and allowed zone.
  2. Verify face at the kiosk if enabled. Perform liveness/presentation-attack detection and compare against that credential’s enrolled template on an approved on-premises system.
  3. Apply access rules. Send only the outcome and transaction reference to the access workflow. PPE/induction rules and controller safety inputs still govern normal entry.
  4. Handle exceptions. No match, failed liveness, PPE obstruction, unenrolled user or outage goes to supervised QR/badge verification. The standard gate and emergency egress workflow remain available.

Scope facial recognition to 1:1 verification at the kiosk. Keep biometric templates separate from VMS/incident evidence. Use controlled enrolment, restricted access, encryption, retention/deletion and audit. Review the applicable Indian privacy obligations, commencement dates and worker notice with SEL before collecting biometric data.

Scanner workflow preview

Simulated inputs · no camera permission or biometric collection

Choose a mode and run the check.

CONTROL ROOM AND GOVERNANCE

How the plant manages alerts and data

Capture event → show camera, location and clip → acknowledge → route to the responsible team → verify action and close the case. Review alert quality, recurrence and open actions on the plant dashboard.

OwnerOperational responsibilityManagement evidence
Security / ISCROwn 24-hour gate and perimeter monitoring, triage, guard fallback, authorised playback and exports.Incident timeline, acknowledgment/closure, dispatch and override audit.
Production / EHSDefine and verify site rules for forklifts, lifts, PPE, pedestrian routes, guards and handling. Confirm incidents before corrective action.Verified alerts, repeat zones, open corrective actions, nuisance events and missed detections from test reviews.
IT/OT and MaintenanceOwn service health, secure remote access, patches, backups, device integrity and read-only OEM integrations.Camera availability, recording gaps, storage headroom, capacity alarms and restore results.
HR / Legal / Occupational HealthApprove purpose, access and data lifecycle. Restrict optional biometric administration and health referrals to authorised staff.Enrollment and deletion audit if enabled, access review and exception handling. Screening details stay in the Occupational Health workflow.

Continuous video follows the SLA retention design. Agree retention separately for event clips, plate logs, access records and any biometric templates. Use restricted exports with audit, approved privacy masking, and disabled unused audio. Align service desk and escalation with the draft SLA’s severity 1–4 resolution schedule of 4 / 12 / 24 / 96 hours. Confirm service-credit triggers, weekly reports and quarterly maintenance.

DELIVERY AND ACCEPTANCE

Release gates for the plant head

Indicative timingRelease evidenceApproval owners
Weeks 1–2 · SurveyConfirmed gate lanes, camera count, floor positions, RAOC inventory, civil/fiber route and machine asset list.Security, EHS, Engineering and IT/OT
Weeks 3–4 · Design / FATSigned camera view plan and I/O list, exact firmware interoperability, network/storage/UPS budgets and priced scope.Plant Engineering, IT/OT and Procurement
Weeks 5–7 · PilotDay/night gate and perimeter checks, representative AI rules, operator drill, outage recovery and optional scanner evaluation using approved pilot data if separately authorised. Agree measured throughput, false matches/non-matches, presentation-attack checks and manual fallback.Security, EHS, IT/OT and HR/Legal for optional face verification
Weeks 8–12 · Rollout / SATZone sign-off, clip/alert evidence, restoration tests, operator training and signed handover. Audit 30-day playback after the archive accrues.Plant Head and workstream owners

Pilot scorecard. Record alert recall by rule and shift, false alerts per camera-hour, 95th-percentile time to alert, throughput at peak shift change, camera uptime and recovery after link or recorder loss. Agree thresholds and sample sizes with the owners before testing.